THRSP1132 · Theater
Build global data infrastructure with computing‑power‑cooling synergy
Speakers: Jason ZHANG
Microsoft’s player cannot open a video at a given time: once it plays, skip to the time shown.
What the session covers
A vendor theater session about physical AI data center (AIDC) infrastructure, not Microsoft software. The speaker links rising GPU density, from H100 to Rubin, to four challenges: supporting facilities that take up more space than the IT racks, power supply and energy cost, slow construction, and GPU load fluctuations of up to 180%. He describes a power chain and a cooling chain running from chip to building, and six trends including 800 V DC, solid-state transformers, liquid cooling and prefabricated delivery. Products covered include a modular UPS, 800 V HVDC, a break power unit, containerised power transit units, a 5 MW power generation block, an all-in-one liquid cooling pod and CDUs above 2 MW. The session ends with a company profile and a booth reference.
Best for: Data center facility engineers and infrastructure planners evaluating power and liquid cooling for high-density GPU deployments.
New material: no clear start of new material was found in this session.
Where to skip: For a Copilot specialist this session can be skipped entirely. If you are curious about hardware, watch 11:19–15:23 (computing–power–cooling synergy and GPU load surges) and 15:23–20:49 (800 V HVDC, solid-state transformer and UPS roadmap). The rest is general trends and a company profile.
Chapters (8)
- 00:00 Recap Depth 100 · Novelty 0/3
Intro: hardware behind AI software, data center demand and GPU density growth
The speaker sets the session apart from the software-focused Ignite content by focusing on data center infrastructure and introduces the agenda: trends and challenges, solutions, and key takeaways. He cites booming global data center demand concentrated in the US. He links the growth to NVIDIA GPU generations from H100 to Rubin, with roughly 10x compute per GPU and over 100x per cabinet.
- 02:29 Deep dive Depth 100 · Novelty 1/3
Four infrastructure challenges of AI data centers
The speaker lists four challenges. Supporting facilities now take more space than the IT/GPU racks. Rising power demand and energy costs put pressure on supply and cost. Construction is slow, typically two to three years because of site complexity. GPU load fluctuations can reach up to 180%.
- 04:25 Deep dive Depth 200 · Novelty 1/3
Two full-chain solution and six technology trends: grid, 800 V DC, liquid cooling
The speaker describes a power chain and a cooling chain running from chip to rack, data hall and building, aimed at optimising PUE and keeping compute power stable. He covers six trends: grid access constraints addressed with gas generation and energy storage; power architecture moving to 800 V DC and solid-state transformers; high-performance, space-saving equipment; full DC systems with their own safety and short-circuit concerns; hybrid air and liquid cooling moving toward pure liquid cooling; and prefabricated delivery. He also notes that AIDC building design is shifting toward high density through layout optimisation and functional zone planning.
- 08:36 Deep dive Depth 200 · Novelty 1/3
GW-scale AIDC example: modular, prefabricated, plug-and-play, speed to power
A planned gigawatt-level AIDC building is shown as an example built on modular, prefabricated, plug-and-play design and speed to power. Computing, cooling and power zones are modular, built and tested in the factory, and shipped to site as containers. Off-grid, renewable or energy storage systems supply power where grid electricity is missing. A topology slide shows power stepping down from 150 kV to low-voltage AC and then DC to the GPU, which requires synergy at every layer.
- 11:19 Deep dive Depth 200 · Novelty 1/3
Multi-dimensional synergy of computing, power and cooling for GPU load surges
The speaker explains that AIDCs must handle electrical loss, heat and power surges during AI training. GPU loads fluctuate up to 180%, compared with 70–80% for traditional loads. He proposes three synergies (computing–power, computing–cooling, power–cooling) to achieve zero interruption, long-term efficient GPU operation, low PUE and optimal opex. Measures include on-site green power, gas turbines and storage (Texas, for example, resists grid connections above 75 MW), prefabricated power modules and skids, equipment that can withstand GPU peaks, and liquid cooling.
- 15:23 Deep dive Depth 300 · Novelty 1/3
Power portfolio: modular UPS, 800 V HVDC, solid-state transformer, BPU, PTU containers
The speaker groups products into four scenarios: power, cooling, infrastructure pod, and energy storage system (ESS). The power roadmap goes from AC UPS to 800 V HVDC, with solid-state transformers expected from 2027 and mass production in late 2027 or 2028. He describes a high-density modular UPS with lithium batteries, a break power unit converting 800 V to 50 V that would be co-developed with IT and chip vendors, and a containerised power transit unit (40 ft power, 20 ft transformer and battery, 2.5 MW). He also presents solar plus gas turbine plus ESS for sites without grid access.
- 20:49 Deep dive Depth 200 · Novelty 1/3
5 MW power generation block, all-in-one liquid cooling pod and 2 MW+ CDUs
The speaker mentions a 5 MW standard block for power generation and then moves to cooling, presenting liquid cooling as the trend from edge AI to large AIDCs. The liquid cooling pod combines rack, liquid cooling, monitoring and power systems in one container that is shipped to site with no construction or on-site commissioning. Coolant distribution units (CDUs) have grown from 300–400 kW about two years ago to more than 2 MW. Their four key features are architectural security, intelligent management, safety and worry-free O&M.
- 22:30 Closing Depth 100 · Novelty 0/3
CDU co-development with hyperscalers, company profile and key takeaways
The speaker invites hyperscalers to co-develop next-generation CDUs, says the company already does this with Google and others, and cites more than 1,000 R&D staff. The company profile covers nearly 40 years in data center power and renewable energy, 370,000 m² of supply chain including a Malaysia site for the US market, and EU/IEC compliance. He adds that the company also builds data centers in China and uses that O&M experience in its products. The session closes with the goal of reliable, efficient and cost-effective AIDC infrastructure and a reference to booth 6040.
Announcements (0)
No specific announcement was made in this session.
Demos (0)
No demos.